PMFORUM Breaking News

Breaking News in the Project Management World

Wednesday, April 30, 2008
Phoenix spacecraft scheduled to land on Mars on May 25
NASA's Phoenix Mars Lander is on schedule for its May 25th landing on the Red Planet. NASA has conditionally approved a landing site in a broad, flat valley informally called "Green Valley." A final decision will be made based on images from NASA's Mars Reconnaissance Orbiter.

The landing area is an ellipse about 62 miles by 12 miles. Researchers have mapped more than five million rocks in and around that ellipse, each big enough to end the mission if hit by the spacecraft during landing. Knowing where to avoid the rockier areas, the team has selected a scientifically exciting target that also offers the best chances for the spacecraft to set itself down safely onto the Martian surface.

"Our landing area has the largest concentration of ice on Mars outside of the polar caps. If you want to search for a habitable zone in the arctic permafrost, then this is the place to go," said Peter Smith, principal investigator for the mission, at the University of Arizona, Tucson.

Phoenix will dig to an ice-rich layer expected to lie within arm's reach of the surface. It will analyze the water and soil for evidence about climate cycles and investigate whether the environment there has been favorable for microbial life.

"We have never before had so much information about a Mars site prior to landing," said Ray Arvidson of Washington University in St. Louis. Arvidson is chairman of the Phoenix landing-site working group and has worked on Mars landings since the first successful Viking landers in 1976.

"The environmental risks at landing -- rocks and slopes -- represent the most significant threat to a successful mission. There's always a chance that we'll roll snake eyes, but we have identified an area that is very flat and relatively free of large boulders," said JPL's David Spencer, Phoenix deputy project manager and co-chair of the landing site working group.

Today's trajectory adjustment began by pivoting Phoenix 145 degrees to orient and then fire spacecraft thrusters for about 35 seconds, then pivoting Phoenix back to point its main antenna toward Earth. The mission has three more planned opportunities for maneuvers before May 25 to further refine the trajectory for a safe landing at the desired location.

In the final seven minutes of its flight on May 25, Phoenix must perform a challenging series of actions to safely decelerate from nearly 13,000 mph. The spacecraft will release a parachute and then use pulse thrusters at approximately 3,000 feet from the surface to slow to about 5 mph and land on three legs.

"Landing on Mars is extremely challenging. In fact, not since the 1970's have we had a successful powered landing on this unforgiving planet. There's no guarantee of success, but we are doing everything we can to mitigate the risks," said Doug McCuistion, director of NASA's Mars Exploration Program at NASA Headquarters in Washington.

Created in 1958, the National Aeronautics and Space Administration (NASA) is America’s focal point for research, development and exploration of outer space. In 2005, the US President and Congress committed the United States to exploring the solar system and beyond: completing assembly of the International Space Station, flying the new Crew Exploration Vehicle no later than 2014, returning astronauts to the moon by the end of the next decade, and sending human missions to Mars and beyond. For over 50 years, NASA has been leading the world in the development and usage of advanced program and project management. Additional information about NASA can be found at www.nasa.gov. For more information about Phoenix, visit: http://www.nasa.gov/phoenix


Back to News Index

This page is powered by Blogger. Isn't yours?